ASTA

From Rsewiki
(Difference between revisions)
Jump to: navigation, search
(ASTA insides)
 
(7 intermediate revisions by one user not shown)
Line 3: Line 3:
  
  
=Autonomous Systems Test Arena=
+
=Autonomous Systems Test Arena (building 330D)=
  
 
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
 
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Line 9: Line 9:
 
[[File:asta_as_of_06_apr_2020_1.jpg | 450px]]
 
[[File:asta_as_of_06_apr_2020_1.jpg | 450px]]
  
===Plan===
+
===Status===
  
6 July 2020 to September):  
+
28 June 2021:  
* Termination of power, network and access control.
+
Fully operational (:D)
* Finalize installation of pool and camera system.
+
* Grand opening - September
+
* Full operation
+
  
 
=== Instructions ===
 
=== Instructions ===
Line 28: Line 25:
  
 
=== ASTA insides ===
 
=== ASTA insides ===
 +
 +
* [http://aut.elektro.dtu.dk/rse/ASTA/asta_view.html View to ASTA] (must be on local net (10.59.8/9.x) to work)
  
 
* [[Building history]] - pictures from process
 
* [[Building history]] - pictures from process
 
* [[Fence blocks]] - former Autonomous Eco-car fence
 
 
* [[Drone net]] - drone net mounting
 
  
 
===Maintainer===
 
===Maintainer===
  
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)
+
This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)

Latest revision as of 13:03, 2 March 2023



Contents

[edit] Autonomous Systems Test Arena (building 330D)

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Asta as of 06 apr 2020 1.jpg

[edit] Status

28 June 2021: Fully operational (:D)

[edit] Instructions

  • ASTA pool - instructions for pool use and maintenance.

[edit] ASTA insides

[edit] Maintainer

This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox