ASTA

From Rsewiki
(Difference between revisions)
Jump to: navigation, search
(Plan)
(ASTA insides)
 
(2 intermediate revisions by one user not shown)
Line 11: Line 11:
 
===Status===
 
===Status===
  
18 June 2021:  
+
28 June 2021:  
Fully operational, but work in progress with:
+
Fully operational (:D)
* Reservation through room booking (should be ready shortly)
+
  
 
=== Instructions ===
 
=== Instructions ===
Line 30: Line 29:
  
 
* [[Building history]] - pictures from process
 
* [[Building history]] - pictures from process
 
* [[Fence blocks]] - former Autonomous Eco-car fence
 
 
* [[Drone net]] - drone net mounting
 
  
 
===Maintainer===
 
===Maintainer===
  
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)
+
This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)

Latest revision as of 13:03, 2 March 2023



Contents

[edit] Autonomous Systems Test Arena (building 330D)

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Asta as of 06 apr 2020 1.jpg

[edit] Status

28 June 2021: Fully operational (:D)

[edit] Instructions

  • ASTA pool - instructions for pool use and maintenance.

[edit] ASTA insides

[edit] Maintainer

This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox