ASTA
(→Current state) |
(→Autonomous Systems Test Arena) |
||
Line 3: | Line 3: | ||
=Autonomous Systems Test Arena= | =Autonomous Systems Test Arena= | ||
− | Our new facility for cooperating autonomous systems - in air, on ground, on water and below water. | + | Our new facility for cooperating autonomous systems - in air, on the ground, on water and below water. |
[[File:artist-impression.png | 800px]] | [[File:artist-impression.png | 800px]] | ||
− | Rambøl - expected view of building from south. | + | Rambøl - expected view of building from the south. |
===Sketch of building 330D === | ===Sketch of building 330D === | ||
Line 16: | Line 16: | ||
[[File:ASTA-overview-21-oct-2019.png | 600px]] | [[File:ASTA-overview-21-oct-2019.png | 600px]] | ||
− | Overall sketch of facility, an air dome, about 23 x 40m with a roof height of 14m. | + | Overall sketch of the facility, an air dome, about 23 x 40m with a roof height of 14m. |
− | The dome is divided into 3 sections with drone ( | + | The dome is divided into 3 sections with drone (removable) net. In one end is a pool 3.3 x 6.5 x 3m and in the same area a camera localization system for accurate ground truth localization. |
=== Current state === | === Current state === | ||
Line 29: | Line 29: | ||
[[File:asta_as_of_4_nov_2019.png | 600px]] | [[File:asta_as_of_4_nov_2019.png | 600px]] | ||
− | as of 4 November 2019. | + | as of 4 November 2019. The first level of concrete in place, the upper part of the foundation to be cast Monday 11 November. Then the pool preparation is next. |
After that the indoor asphalt and foundation for entrance, gate and emergency exits. | After that the indoor asphalt and foundation for entrance, gate and emergency exits. |
Revision as of 10:22, 8 November 2019
Autonomous Systems Test Arena
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below water.
Rambøl - expected view of building from the south.
Sketch of building 330D
Overall sketch of the facility, an air dome, about 23 x 40m with a roof height of 14m. The dome is divided into 3 sections with drone (removable) net. In one end is a pool 3.3 x 6.5 x 3m and in the same area a camera localization system for accurate ground truth localization.
Current state
Expected finalized in February 2020.
as of 23 October 2019. Edge foundation started.
as of 4 November 2019. The first level of concrete in place, the upper part of the foundation to be cast Monday 11 November. Then the pool preparation is next.
After that the indoor asphalt and foundation for entrance, gate and emergency exits.
Dome delivery and mounting in January 2019.
Dome inflation and in-door preparation in February 2020.