[[File:asta_as_of_10_dec_2019.jpg | 400px]]
 +
 +
As of 10 Dec 2019. Reinforcement in stainless steel for the pool sides is being built.
  
 
[[File:asta_as_of_09_dec_2019.jpg | 400px]]
 
[[File:asta_as_of_09_dec_2019.jpg | 400px]]
Line 45: Line 48:
 
As of 9 Dec 2019. The pool is on its way, the bottom plate is cast.
 
As of 9 Dec 2019. The pool is on its way, the bottom plate is cast.
  
[[File:asta_as_of_10_dec_2019.jpg | 400px]]
 
 
As of 10 Dec 2019. Reinforcement in stainless steel for the pool sides is being built.
 
  
 
[[File:asta_as_of_04_dec_2019_1.jpg | 400px]]
 
[[File:asta_as_of_04_dec_2019_1.jpg | 400px]]
Line 56: Line 56:
  
 
After that the indoor asphalt and foundation for entrance, gate and emergency exits.
 
After that the indoor asphalt and foundation for entrance, gate and emergency exits.
 
 
 
  
 
====November 2019 ====
 
====November 2019 ====

Revision as of 16:18, 12 December 2019


Die asta.png (jyllands-posten.dk)

Contents

Autonomous Systems Test Arena

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below water.


Artist-impression.png

Rambøl - expected view of building from the south - operational March 2020.

Sub-pages

Sketch of building 330D

ASTA-onshape-drawing 02.png... ASTA-overview-21-oct-2019.png

Overall sketch of the facility, an air dome, about 23 x 40m with a roof height of 14m. The dome is divided into 3 sections with drone net. In one end is a pool 3.5 x 6.5 x 3m deep and in the same area a camera localization system for accurate ground truth localization.

Current state

December 2019

Asta as of 12 dec 2019 1.jpg Asta as of 12 dec 2019 2.jpg

Asta as of 12 dec 2019 4.jpg

As of 12 Dec 2019. Reinforcement - almost - in place, sides will be cast Friday (13 Dec 2019)


Asta as of 10 dec 2019.jpg

As of 10 Dec 2019. Reinforcement in stainless steel for the pool sides is being built.

Asta as of 09 dec 2019.jpg

As of 9 Dec 2019. The pool is on its way, the bottom plate is cast.


Asta as of 04 dec 2019 1.jpg Asta as of 04 dec 2019 2.jpg

As of 4 Dec 2019. All quiet, waiting for the pool people.


After that the indoor asphalt and foundation for entrance, gate and emergency exits.

November 2019

Asta as of 27 nov 2019 pool base.jpg Asta as of 27 nov 2019 outside drain.jpg

As of 27 Nov 2019. The pool pit is finished and a clean base for the pool is in place. The outside drain is in progress.

Asta as of 22 nov 2019 pool corner.jpg

As of 22 Nov 2019. Pool pit progressing and preparing for the outside drain.

Asta as of 20 nov 2019.jpg Asta as of 20 nov 2019 entrance cast.jpg

As of 20 Nov 2019. Pool pit started and final part of the foundation (entrance) cast.


Asta as of 18 nov 2019.jpg

As of 18 Nov 2019. The foundation looks good and excavating for the pool has started. The plan is to cast the entrance on Wednesday and the bottom of the pool-hole on Friday, ready for the pool team on Monday 27 Nov.


Asta as of 14 nov 2019.jpg Asta as of 14 nov 2019 entrance.jpg

As of 14 Nov 2019. Most of the foundation is now cast and the form is being removed. The casting of the entrance part of the foundation is being prepared.


Asta as of 11 nov 2019.jpg

As of 11 Nov 2019. The final height of foundation being marked and in-door floor levelling in the background (before asphalt) - except for pool area (upper left).

Asta as of 8 nov 2019 before pool.jpg

As of 8 Nov 2019. Concrete form for foundation cast in place. This is the corner, where the pool is to be placed.

Asta as of 4 nov 2019.png

as of 4 Nov 2019. The first level of concrete in place.

October 2019

Fundament 23oct2019.png

as of 23 October 2019. Edge foundation started.