ASTA
From Rsewiki
(Difference between revisions)
(→Autonomous Systems Test Arena) |
(→Plan) |
||
Line 13: | Line 13: | ||
15 June to XXX): | 15 June to XXX): | ||
* Termination of power, network and access control. | * Termination of power, network and access control. | ||
− | * Finalize installation of | + | * Finalize installation of pool and camera truss. |
* Grand opening - September | * Grand opening - September | ||
Revision as of 14:22, 6 July 2020
Contents |
Autonomous Systems Test Arena
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Plan
15 June to XXX):
- Termination of power, network and access control.
- Finalize installation of pool and camera truss.
- Grand opening - September
Instructions
- ASTA access - instruction for access
- ASTA pool - instructions for pool use and maintenance.
- ASTA localization system - instructions for use
ASTA insides
- Building history - pictures from process
- Fence blocks - former Autonomous Eco-car fence
- Drone net - drone net mounting
Maintainer
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)