ASTA

From Rsewiki
(Difference between revisions)
Jump to: navigation, search
(Plan)
(Plan)
Line 13: Line 13:
 
6 July to XXX):  
 
6 July to XXX):  
 
* Termination of power, network and access control.
 
* Termination of power, network and access control.
* Finalize installation of pool and camera truss.
+
* Finalize installation of pool and camera system.
 
* Grand opening - September
 
* Grand opening - September
  

Revision as of 15:56, 6 July 2020



Contents

Autonomous Systems Test Arena

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Asta as of 06 apr 2020 1.jpg

Plan

6 July to XXX):

  • Termination of power, network and access control.
  • Finalize installation of pool and camera system.
  • Grand opening - September

Instructions

  • ASTA pool - instructions for pool use and maintenance.

ASTA insides

Maintainer

This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox