ASTA
From Rsewiki
(Difference between revisions)
(→Sub-pages) |
(→Pool) |
||
Line 16: | Line 16: | ||
* [[ASTA access]] - instruction for access | * [[ASTA access]] - instruction for access | ||
− | * [[ | + | * [[ASTA pool]] - instructions for pool use and maintenance. |
− | * [[ASTA localization system]] | + | * [[ASTA localization system]] - instructions for use |
=== ASTA insides === | === ASTA insides === |
Revision as of 08:21, 18 June 2020
Contents |
Autonomous Systems Test Arena
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Rambøl - expected view of building from the south - operational September 2020.
Pool
- ASTA access - instruction for access
- ASTA pool - instructions for pool use and maintenance.
- ASTA localization system - instructions for use
ASTA insides
- Fence blocks - former Autonomous Eco-car fence
- Drone net - drone net mounting
- Building history - pictures from process
Maintainer
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)