ASTA

From Rsewiki
(Difference between revisions)
Jump to: navigation, search
(Plan)
(Autonomous Systems Test Arena)
Line 7: Line 7:
 
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
 
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
  
 
+
[[File:asta_as_of_06_apr_2020_1.jpg | 450px]]
[[File:artist-impression.png | 600px]]
+
 
+
Rambøl - expected view of building from the south - operational September 2020.
+
  
 
===Plan===
 
===Plan===

Revision as of 08:55, 18 June 2020



Contents

Autonomous Systems Test Arena

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Asta as of 06 apr 2020 1.jpg

Plan

15 June to XXX):

  • Termination of power, network and access control.
  • Finalize installation of office cabin, storage, pool and camera truss.
  • Grand opening - September

Instructions

  • ASTA pool - instructions for pool use and maintenance.

ASTA insides

Maintainer

This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox