ASTA
From Rsewiki
(Difference between revisions)
(→Plan) |
(→Plan) |
||
Line 11: | Line 11: | ||
===Plan=== | ===Plan=== | ||
− | + | 6 July to XXX): | |
* Termination of power, network and access control. | * Termination of power, network and access control. | ||
* Finalize installation of pool and camera truss. | * Finalize installation of pool and camera truss. |
Revision as of 14:22, 6 July 2020
Contents |
Autonomous Systems Test Arena
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Plan
6 July to XXX):
- Termination of power, network and access control.
- Finalize installation of pool and camera truss.
- Grand opening - September
Instructions
- ASTA access - instruction for access
- ASTA pool - instructions for pool use and maintenance.
- ASTA localization system - instructions for use
ASTA insides
- Building history - pictures from process
- Fence blocks - former Autonomous Eco-car fence
- Drone net - drone net mounting
Maintainer
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)