ASTA
From Rsewiki
(Difference between revisions)
(→Autonomous Systems Test Arena) |
(→Plan) |
||
Line 11: | Line 11: | ||
===Plan=== | ===Plan=== | ||
− | 6 July 2020 to | + | 6 July 2020 to September): |
* Termination of power, network and access control. | * Termination of power, network and access control. | ||
* Finalize installation of pool and camera system. | * Finalize installation of pool and camera system. | ||
* Grand opening - September | * Grand opening - September | ||
+ | * Full operation | ||
=== Instructions === | === Instructions === |
Revision as of 07:21, 21 July 2020
Contents |
Autonomous Systems Test Arena
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Plan
6 July 2020 to September):
- Termination of power, network and access control.
- Finalize installation of pool and camera system.
- Grand opening - September
- Full operation
Instructions
- ASTA access - instruction for access
- ASTA pool - instructions for pool use and maintenance.
- ASTA localization system - instructions for use
- ASTA booking - instructions for booking.
ASTA insides
- Building history - pictures from process
- Fence blocks - former Autonomous Eco-car fence
- Drone net - drone net mounting
Maintainer
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)