ASTA

From Rsewiki
(Difference between revisions)
Jump to: navigation, search
(Plan)
Line 15: Line 15:
  
 
15 June to XXX):  
 
15 June to XXX):  
* Termination of power, network and access control.
+
* Termination of power, network and access control.
* Finalize installation of office cabin, storage, pool and camera truss.
+
* Finalize installation of office cabin, storage, pool and camera truss.
* Grand opening - September
+
* Grand opening - September
 
+
  
 
=== Instructions ===
 
=== Instructions ===

Revision as of 09:53, 18 June 2020



Contents

Autonomous Systems Test Arena

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.


Artist-impression.png

Rambøl - expected view of building from the south - operational September 2020.

Plan

15 June to XXX):

  • Termination of power, network and access control.
  • Finalize installation of office cabin, storage, pool and camera truss.
  • Grand opening - September

Instructions

  • ASTA pool - instructions for pool use and maintenance.

ASTA insides

Maintainer

This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox